Acceptance criteria

What it is

Acceptance criteria are the conditions a specific change must meet
before it can be accepted. They describe what someone can observe
under stated circumstances. “Send a booking confirmation” names a
feature. “After an available appointment is booked, the confirmation
shows the same appointment reference and start time as the booking
record” gives a way to verify part of the feature. It leaves the
team free to choose how the confirmation is generated.

The UK Government Service Manual describes acceptance criteria for a
user story as an outcome checklist for confirming that the service
has done its job. The story captures the user and the need. The
criteria make the agreement concrete enough to discuss, implement
and verify. A criterion can address an error path, an accessibility
requirement or an operational constraint if it materially affects
whether this change is acceptable. Different criteria may need
different kinds of evidence.

Consider the relationship to three other artifacts. A specification
can contain requirements that apply to many changes. A test case is
a particular execution or example that produces evidence for one or
more criteria. The Definition of Done in Scrum describes the quality
measures that all work in an Increment must meet. Individual
criteria address the behavior or limits of this change. For
instance, a team might check keyboard reachability for every
interactive change and also require that a particular appointment
can be confirmed and revisited with the keyboard.

Why it matters

Good criteria make disagreements visible while a change is still
cheap to adjust. A project sponsor may say that booking is
successful when an appointment exists. A customer may expect the
confirmation message to arrive, and support may need a reference
when that message gets lost. Those are different outcomes. Deciding
when to show success, what to do after an email provider fails and
which reference is authoritative avoids discovering the conflict
after release.

They also give verification a destination. A reviewer can inspect
the booking page and a test operator can interrupt message delivery.
Each knows what observation would count. Accessibility may need a
keyboard walkthrough in addition to an automated assertion. Timing
might need a measurement under a named load and a known test
environment. A condition that only says the system must be “fast”
leaves several incompatible choices unresolved.

Standards and regulations still apply without a line in the story.
List a change-specific interpretation when the team would otherwise
need to guess. If keyboard support is already a shared rule,
describe how it applies to the unfamiliar date picker and use the
existing standard as evidence. That keeps the story brief while
protecting the behavior readers and operators need.

What it looks like in practice

Imagine a service that lets people reserve an appointment and
receive a confirmation message. A first draft might say “the
appointment can be booked and an email is sent”. Bring a service
owner, engineer and tester together and walk through three concrete
attempts. The following examples are illustrative. Their exact
wording would come from the team operating that service.

  * With an available appointment at 14:00 in the stated time zone,
one confirmed booking is created and its reference, date and time
appear on the confirmation page. Compare the values with the booking
record.

  * When the appointment is already taken by the time the request
reaches the service, the user sees that the slot is unavailable and
can return to available times. The competing request creates no
additional booking for the occupied slot.

  * Once the service has confirmed the booking, a simulated message
delivery failure leaves that booking intact. The confirmation page
still supplies the reference, and the failure is visible to the
operator responsible for follow-up.

The examples state a starting situation, an action and a verifiable
result. Gherkin expresses that structure with Given, When and Then.
That format can improve readability and connect scenarios to
automation. A short checklist works just as well for a simple
change. In either form, specify which reference to compare and
decide whose view supplies the evidence. A green status in a send
queue cannot demonstrate that an email was received.

Run the first attempt through the actual screen. Test the competing
update with the request ordering controlled. Simulate the message
failure after the booking transaction has finished. Document the
three observations in the work item so someone can reproduce the
evidence. For a related example of specificity, see our
accessibility statement, which describes keyboard checks and what
was observed or still requires review. That is the level of evidence
to ask for when a criterion depends on what a reader can actually
do.

Where it goes wrong

Vague language moves the decision to the end. “The error is handled
gracefully” is one example. Name the state, the information shown,
the action still available and any effect that must be prevented. In
the booking example those details tell a tester to verify both the
visible recovery path and the booking record. A screenshot of the
error message by itself leaves the second part unanswered.

Criteria can also prescribe implementation before it is justified.
“Use the new queue” may be a legitimate architecture constraint, but
it will not tell a user what happens when a confirmation is delayed.
Keep the architecture decision where it can be explained and frame
the criterion around observable behavior and evidence. If a specific
protocol or storage location is compulsory for an external
integration, cite that requirement and explain the boundary.

The opposite problem is a list so large it describes an entire
release. Split the work by outcome and keep the important failure
path with its corresponding behavior. Agree which constraints are
shared and who verifies this particular change. When a prototype or
test reveals a missed requirement, update the criterion with its
reason and rerun the affected verification. Recording that change
preserves the agreement that was used, so the next person can see
both what passed and what remains open.

Further reading

  * UK Government Service Manual on user stories and acceptance
criteria

  * Cucumber's Gherkin reference for scenarios and examples

  * The Scrum Guide's Definition of Done

  * W3C guidance on testing keyboard functionality