Migration

What it is

A migration is a planned move of something already in use to a new
version or platform, carried out in steps, with the old one retired
at the end. The thing being moved can be a whole workload, an
application, a body of data or the structure that data is kept in.
What separates a migration from a rebuild is that the system stays
in use while it moves: its users, records and integrations come
along, and the old version keeps working until the new one has taken
over.

Engineers use the word at two scales, often without saying which one
they mean.

At the large scale it is a move to a new platform or a new major
version. Microsoft's Cloud Adoption Framework treats moving
workloads to Azure, from servers on premises or from another cloud,
as five steps: plan, prepare the workloads, execute, optimise, and
decommission the source. Esri's customers move their maps and data
from ArcMap to ArcGIS Pro. A Next.js application moves from the
Pages Router to the App Router, and `getServerSideProps` gives way
to fetching data inside Server Components. A PostgreSQL cluster
moves to a new major version, which often changes the layout of the
system tables, so the data is carried across with `pg_upgrade` or
with a dump and restore.

At the small scale a migration is one versioned change to a
database's structure, kept as a file in the repository and applied
by a tool in a fixed order. Django calls its migrations a version
control system for the database schema: each file records a change
to the models, is committed with the code, and runs in the same
sequence on a developer's laptop, on staging and in production.
GitLab ships batched background migrations that rewrite large tables
a batch at a time after an upgrade, for example widening integer
columns to `bigint` before they overflow. A data migration belongs
here too: one that changes the rows rather than the columns, such as
filling a new field from two old ones.

These are one idea at two scales. Each has a known starting state,
an ordered set of steps, a target, and a way back if a step goes
wrong. A platform move usually contains schema migrations, and a
long run of schema migrations is, over the years, a platform
changing piece by piece under the people who use it.

Why it matters

Software outlives what it was built on. Cloud contracts are
renegotiated, frameworks change their model, and vendors retire
products. A system kept for a decade will be migrated several times
in that decade, so how well a team migrates ends up mattering more
than how well it chose the first platform.

1. The split state is where the cost lands. While part of a system
runs on the old platform and part on the new, both have to be
operated, monitored and kept consistent. The Cloud Adoption
Framework tells teams to keep that period short and to move
components that depend directly on each other in the same wave.

2. A database cannot be redeployed. Code can be built again and
replaced; the rows in production cannot. Schema migrations turn a
change to live structure into a file that can be reviewed, tested
against a copy, applied in order and, for most changes, reversed.
The alternative is a production schema that is whatever the last
person with a console left behind.

3. A planned move can be undone. The Cloud Adoption Framework asks
for rollback criteria and procedures to be set before any migration
starts, for the rollback to be tested, and for go/no-go checkpoints
along the way.

The trade-offs sit in the cutover. The Cloud Adoption Framework
separates migration with downtime from migration with near-zero
downtime, where data is replicated continuously and the switch comes
at the end. For a major version of PostgreSQL, `pg_upgrade` shortens
the cutover: it skips the dump and restore such an upgrade typically
requires by reusing the existing data files, and in `--link` mode,
which copies no files, it is much faster again.

What it looks like in practice

Three projects on this site show the term at three sizes, from a
whole platform down to the order of the files in one repository.

One migration was a move off a cloud provider. A client's AWS setup
had been over-provisioned, and the work began by reviewing what was
really used: unnecessary services went, and the remaining capacity
was adjusted. The workloads then left AWS. The engagement record
supports those infrastructure changes. Cutting unused services
before moving meant there was less to carry; it does not establish a
like-for-like cost ratio, a productivity result or a disruption-free
migration.

The second was an engine change with a new design at the far end. A
geographic map application's database moved from MSSQL to PostgreSQL
with the PostGIS extension, and the target was not a copy of the old
structure. The new schema was designed for spatial data, with GiST
and SP-GiST indexes and strict foreign key and check constraints
that enforce validation rules on spatial coordinates. Over 50
million spatial records travelled into it through ETL pipelines that
transformed them to EPSG:4326. A move onto a new design is the
chance to state the data's rules in the schema itself. The page
reports a 10x improvement in spatial query performance and backend
CPU load down by 65%.

The third is the small scale, kept up for years. One platform's
schema is the sum of

1,022 migrations, numbered 036 through 1102, and the page calls the
ordering discipline around them unglamorous and non-negotiable. The
history in the repository is a description of production, and it
stays true only while any database, from a developer's fresh copy to
a restore, can be rebuilt by replaying it from the first file to the
last.

Where it goes wrong

The cutover gets the planning, and the trouble tends to gather in
the weeks around it, in four recognisable shapes.

Two systems run side by side for longer than planned. The move
stalls halfway, the pieces left are the hard ones, and the team runs
both platforms for months. Users feel the seam: the Next.js guide
notes that moving between a Pages Router page and an App Router page
is a hard navigation, and that `next/link` does not prefetch across
the two. Keep the waves small and make each next step cheap. One
frontend here moves its pages onto a shared factory that loads each
page in one round trip, so every converted page inherits the
behaviour.

A cutover with no way back. Some steps change the source as well as
the target. With `pg_upgrade --link`, once the new cluster has
started it has written to files the old one shares, and the old
cluster then has to be restored from backup. Esri warns that a
dataset upgraded for ArcGIS Pro may stop being usable in ArcMap, and
tells users to copy it first. In Django, a `RunSQL` operation
written without reverse SQL raises `IrreversibleError` the moment
someone migrates backwards. Set the rollback criteria before the
first step, rehearse the route back, and turn it into a check: one
repository here runs a guard engine whose validators include a check
that a migration can be rolled back.

A migration that already ran gets edited. Migration tools record
which files have been applied and skip them from then on. Change a
file after it has reached production, and production keeps the old
version while every fresh database gets the new one: two schemas
under one history. Leave applied migrations alone and correct them
with a new one; a build that replays the history from empty and
compares it with a migrated copy catches the drift.

The upgraded database is slow on its first day. `pg_upgrade` carries
most planner statistics across, not all, and the planner guesses on
the rest until they are rebuilt. Its `--check` mode changes nothing
and can run while the old server is still serving, so run it first,
and rebuild the missing statistics straight after the upgrade before
gathering the rest:

```sh
pg_upgrade --check -b "$OLD/bin" -B "$NEW/bin" -d "$OLD/data" -D "$NEW/data"
pg_upgrade -b "$OLD/bin" -B "$NEW/bin" -d "$OLD/data" -D "$NEW/data"
vacuumdb --all --analyze-in-stages --missing-stats-only
vacuumdb --all --analyze-only
```

Further reading

  * Plan your migration — Microsoft's method for moving workloads to
Azure: waves, cutover choices and rollback planning.

  * Migrations — Django's guide to versioned schema changes,
reversing them and data migrations.

  * pg_upgrade — the PostgreSQL upgrade tool, with check mode, link
mode, reverting and the statistics steps afterwards.

  * How to migrate from Pages to the App Router — moving a Next.js
application to the new router one page at a time.

  * Migrate existing work — what carries over from ArcMap to ArcGIS
Pro, what has to be converted, and what to back up first.

  * Check migrations before upgrade — how GitLab's batched
background migrations rewrite large tables after an upgrade, and how
to see that they have finished.